ASHEVILLE, N.C. (828newsNOW) — A new piece of public artwork has been installed outside of the historic S&W Building in the middle of downtown Asheville.
“Fluvial,” simultaneously an art installation and public seating, was designed, installed and crafted by Red Metal artist Rachel David. The piece is located to the immediate left of The Times Bar & Coffee at 56 Patton Ave.

Along the Urban Trail
“Fluvial” is the newest stop along the Urban Trail, a downtown walking tour of 30 sculptures tied to Asheville history. “Fluvial” fills Station 7/30 on the UT.
“Fluvial reimagines and replaces the long vacant Station #7 on the Urban Trail and is inspired by Art Deco architecture, Douglas Ellington’s S&W Building and David’s unique artistry,” the city of Asheville wrote on the project page.
A call for artists to submit proposals for Station 7 went out in April 2024. David’s piece was selected by a panel of community stakeholders and Public Art and Culture Commission members in July 2024.
“Fluvial” was officially unveiled to the public at 1 p.m. today, Nov. 13, and is now available for visitors to enjoy.
“Fluvial” photos
Read more. . .
-
Asheville seeks volunteers for annual bike and pedestrian count, greenway survey
The city of Asheville is looking for volunteers to assist the Asheville Transportation Department with its annual bike and pedestrian counts and greenway survey, vital components of grant applications and city planning.
-
License plate readers provide critical leads in double homicide, APD says
Police say the technology helped identify vehicles and people connected to the July 19 Biltmore Avenue shooting, but no arrests or charges have been made
-
Asheville police investigate Sunday night shooting
Victim found with gunshot wound to shoulder near Hanover Street and Haywood Road
-
Rain, storms return to WNC as landslide awareness week begins
Dry weather lasts through Tuesday before showers and thunderstorms return Wednesday, with a higher risk of heavy rain Thursday
-
Swannanoa post office lease signed, project fully funded
New post office on U.S. 70 has a 10-year lease, but construction date remains unknown
